“DANONE DNIPRO”, Kherson

Link:
Year:
2011
Technologies:
S7-300/ WinCC 6.2/ Profibus
Project status:
Completed
About the project:
Modernization of control panel SPS (sewage pumping stations) and SWPS (storm water pumping station) of control system with integration of data into an existing visualisation system. Design, supply, installation and commissioning.